This page was automatically translated using the online service DeepL. The translation is intended to aid understanding and may contain language-specific inaccuracies. The official text is written in German. Any discrepancies or differences resulting solely from the translation are not legally binding. In case of doubt, the German version shall prevail. It is recommended to consult a qualified translator in case of doubt.

Submit a preliminary building application

Hesse Construction Portal
Please note in particular our information under:
  • Service description

    A preliminary building inquiry may cover any matters that are reviewed during the building permit process. A preliminary building inquiry is generally advisable when specific aspects of the construction project are unclear, or when it needs to be determined whether a property is even suitable for development under current building codes. Submitting a preliminary building inquiry can save money, as not all documents required for a building permit are necessary, and the scope of the review is limited to the specific questions at hand.

  • Procedure

    Special information for the Fulda district
    • You fill out the application online on the building portal and submit it, along with the required documents, to the appropriate building authority
    • The building authority will review your request and the documents
    • Once all the necessary documents have been submitted and there are no legal obstacles, a preliminary building permit will be issued.
  • Competent Authority

    The lower-level building regulatory authority of the counties, independent cities, and cities with special status is responsible.

  • What documents are required?

    Special information for the Fulda district
    • Building documents (in digital form on the construction portal or in hard copy) required to answer the respective questions
    • Usually a property plan or an excerpt from the cadastral map
    • Project Description
    • The specific documents required depend on the particular preliminary building permit application
  • What fees apply?

    • The amount of the fee depends on the scope of the preliminary building permit application and may be up to 40 percent of the building inspection fee, with a minimum of €100.
    • The fee shall be determined based on the extent to which the preliminary decision anticipates the building permit.
    • Half of the fee will be credited toward the final building inspection fee if and to the extent that the preliminary building permit is binding in the building permit process.
  • Processing time

    If your construction project is subject to the simplified approval process, the corresponding processing time applies here as well: 3 months, with the option to extend it by up to 2 months.

    The preliminary building permit is deemed to have been granted if no decision has been made within this period.

  • Legal basis

  • Legal remedy

    An appeal may be filed against the agency's decision within one month of its notification.

  • Additional Information


Responsible departments

Help with accessibility

  • General

    We endeavor to make our websites accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    command
    +

    Smaller

    command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use the TAB and SHIFT + TAB keys to navigate to the next or previous links, form fields, and buttons.

    Use the ENTER key to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    control
    option
    command
    .

    Decrease

    control
    option
    command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT SCREEN to quickly turn high contrast mode on or off.

  • Invert colors

    Press the following key combination to switch the color inversion on and off:

    control
    option
    command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the color inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colors

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    option
    command
    8

    Enlarge view

    option
    command
    =

    Reduce view

    option
    command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Reduce view