This page was automatically translated using the online service DeepL. The translation is intended to aid understanding and may contain language-specific inaccuracies. The official text is written in German. Any discrepancies or differences resulting solely from the translation are not legally binding. In case of doubt, the German version shall prevail. It is recommended to consult a qualified translator in case of doubt.

Building control

  • Service description

    All structures falling within the scope of the Hessian Building Code must be planned, constructed, modified, and maintained in such a way that public safety and order—in particular, human life, health, or the natural resources essential to life—are not endangered.
    This obligation generally rests, in the first instance, with the owner or user of the property or facility.

    The other “parties involved in construction”—such as planners, construction managers, contractors, and those authorized to issue certifications or experts—also have various monitoring obligations during the planning and construction phases.
    Those authorized to issue certifications and experts must issue the relevant certifications or certificates and submit them to the building inspection authority.

    The building inspection authority verifies compliance with public law regulations and requirements, as well as the fulfillment of the obligations of those involved in the construction, at its own discretion, depending on the degree of difficulty and the significance of the facility. For special structures, the building permit typically mandates periodic safety inspections at specified intervals, unless such inspections are already required by special building regulations.

    Inspections The building inspection authority’s responsibilities also
    include identifying illegal construction activities and uses—that is, measures for which the required building permit has not been applied for or has not yet been granted. Before the building inspection authority takes enforcement action, it will first request construction documents in order to verify the substantive admissibility of the project. This does not apply in cases of imminent danger.
    These “unauthorized structures” are identified based on the authority’s own investigations, as well as on reports from other agencies, authorities, or neighbors.
     

  • What fees apply?

    A fee based on the time required for the inspections will be charged. This includes time spent on preparation and follow-up work in the office, as well as travel time. For enforcement actions or requests for construction documents, fee ranges of 40.00 euros to 3,200.00 euros are provided for.


Responsible departments

Help with accessibility

  • General

    We endeavor to make our websites accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    command
    +

    Smaller

    command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use the TAB and SHIFT + TAB keys to navigate to the next or previous links, form fields, and buttons.

    Use the ENTER key to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    control
    option
    command
    .

    Decrease

    control
    option
    command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT SCREEN to quickly turn high contrast mode on or off.

  • Invert colors

    Press the following key combination to switch the color inversion on and off:

    control
    option
    command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the color inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colors

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    option
    command
    8

    Enlarge view

    option
    command
    =

    Reduce view

    option
    command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Reduce view