This page was automatically translated using the online service DeepL. The translation is intended to aid understanding and may contain language-specific inaccuracies. The official text is written in German. Any discrepancies or differences resulting solely from the translation are not legally binding. In case of doubt, the German version shall prevail. It is recommended to consult a qualified translator in case of doubt.

Exemption from Approval/Exemption Procedure

Hesse Construction Portal
  • Service description

    The construction, alteration, or change of use of structures that are not special structures and are located within the scope of a zoning plan does not require a building permit if


    • the construction project does not conflict with the provisions of the zoning plan

    • no exceptions, deviations, or exemptions under building codes or planning laws are required (e.g., setback requirements) and

    • access is guaranteed.


    The exemption from planning permission also applies to alterations or changes in use of attic spaces for residential purposes, including the construction of dormers, within areas subject to planning regulations.


    In the cases mentioned above, instead of filing a building permit application, the required construction documents must be submitted to the building authority as part of a notice of construction. The building authority and the municipality, which is involved through the building authority, are under no obligation to review the documents. If the municipality does not notify the building authority that a permitting process is to be conducted, the building owner will receive notification that construction may begin. If the municipality requires a permitting process, the building owner will receive the corresponding notification from the building authority. Since no building permit is issued, the building owner bears sole responsibility for ensuring that the construction project complies with all applicable requirements.


    In principle, the building owner has the option of requesting that a building permit process be carried out for the construction work. In addition, the building owner is responsible for obtaining permits required under other laws (e.g., nature conservation and historic preservation).


    In addition, a special provision will remain in effect through December 31, 2030, under which an exemption from the permit requirement is also possible for the construction of residential buildings in unplanned inner-city areas. This is subject to the condition that the construction project, in terms of its nature and design, blends in with the immediate surroundings and that the municipality or the building authority does not require a permitting process to be carried out.

  • What documents are required?

    For information on the required documents, please see the attached link to building permit documents.


  • What fees apply?

    The fee for the exemption from the permit requirement is 75 euros.

  • What deadlines do I have to observe?

    The authorization to begin construction remains valid for up to 5 years after notification by the building authority. If construction is interrupted for more than two years, the authorization to begin construction becomes invalid.

  • Processing time

    The duration of the process depends on the individual case, but it will not exceed 6 weeks after the building authority receives the documents.

  • Legal basis

  • Legal remedy

    An appeal may be filed against the agency's decision within one month of its notification.


Responsible departments

Help with accessibility

  • General

    We endeavor to make our websites accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    command
    +

    Smaller

    command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use the TAB and SHIFT + TAB keys to navigate to the next or previous links, form fields, and buttons.

    Use the ENTER key to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    control
    option
    command
    .

    Decrease

    control
    option
    command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT SCREEN to quickly turn high contrast mode on or off.

  • Invert colors

    Press the following key combination to switch the color inversion on and off:

    control
    option
    command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the color inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colors

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    option
    command
    8

    Enlarge view

    option
    command
    =

    Reduce view

    option
    command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Reduce view